Review Agenda Item
Meeting Date: 3/15/2011 - 7:30 PM
Category: Untitled
Type: Action
Subject: 14.6 Change Order #1: SunPower Corporation, Systems
LCAP (Local Control Accountability Plan) Goal:
Policy:
Enclosure
File Attachment:
113468_AL1D_OLYMPIC_CP_C_12-13-10.pdf
113468_AL1G_RIO VISTA_CP_B_12-22-10.pdf
113468_AL1I_SHORE ACRES_CP_B_12-17-10.pdf
113468_AL1J_DELTA VIEW_CP_B_12-14-10.pdf
113468_AL1K_BEL AIR_CP_B_12-17-10.pdf
113468_AL1B_ADMIN BLDG_CP_E_02-07-11.pdf
113468_AL1A_MO BASE_CP_C_12-14-10.pdf
113468_AL_EL DORADO_CP_c_1-7-11.pdf
113468_AL_CONCORD HS_CP_E_01-24-11.pdf
113468_AL_Riverview Middle_C_01-03-11.pdf
113468_AL_CAMBRIDGE ELEM_CP_C_1-10-11.pdf
0113468_AL_MONTE GARDEN__CP_C_PROP_wHVAC_01-18-11.pdf
113468_AL2G_WREN AVE_CP_B_12-07-10.pdf
113468_AL2F_WESTWOOD_CP_B_02-24-11.pdf
113468_AL2E_SUN TERRACE_CP_ B_12-08-10.pdf
113468_AL2B_EL MONTE_CP_B_01-05-11.pdf
113468_AL1C_MT DIABLO HIGH_CP_C_12-22-10.pdf
Inc1 15pdf.pdf
Summary Table.pdf
Summary: On October 26, 2010 the Board of Education approved a Design-Build contract with SunPower Corporation, Systems for $65,604,398.00 for the design, procurement installation,training, operation, maintenance, monitoring and 20 year guaranteed performance of Photovoltaic Systems at fifty-one (51) District sites. Recognizing a post-award need to: 1)increase system sizes to address the prospective power demands of the new Heating, Ventilating and Air Conditioning (HVAC) to be installed at 28 sites through the 2010 Measure C Facility Improvement Program; 2)reconfigure the installation location of solar arrays and equipment pads to accommodate established easements and emergency access routes; and 3)adjust array locations to accommodate existing site programs and hardcourt configurations, staff negotiated fixed unit pricing for all such pre-commencement design changes. This fixed pricing matrix was incorporated into the contract documents by way of exhibit.
Staff has worked with District site administrators of all the Increment #1 sites and SunPower to complete the schematic design phase for the Increment #1 sites (17 sites)and is prepared to authorize final design and submission to the Department of the State Architect (DSA). Staff is recommending approval of a change order in the amount of $1,860,247.19 for the design, installtion,and 20 year maintenance, monitoring and guaranteed performance of system additions and modifications necessary to address District power and program requirements at the Increment #1 sites. As a result of this proposed change order total system size for the Increment #1 sites would be increased to address projected HVAC loads from a contract base of 3506.00 kWp to an increased system size of 3791.85 kWp. For purposes of evaluation then, the resulting capital cost/kWp ratio for the Increment #1 sites is increased from $5862 per kWp to $5911 per kWp (an increase of.83%). It is anticipated that collectively, District-wide system size will need to be increased by approximately 1 megawatt to address future HVAC loads. Subsequent pre-commencement change order requests will be submitted for Increment #2 and #3 as systems are finalized and shared with site administrators and schematic designs are approved by the District Program Management team.

The implementation of the system changes identified in this Increment #1 change order will result in an additional projected thirty (30) year savings (avoided cost) in utility expenditures of $8,981,674.00 and an increase (over 5 years) in total CSI revenue of $372,875.00 for a thirty (30) year savings and revenue total of $9,354,549.00.
Funding: 2010 Measure C Funds
Fiscal Impact $1,860,247.19
Recommendation: Approve Change Order as presented.
Approvals:
Recommended By:
Signed By:
Pete Pedersen - Measure C
Signed By:
Steven Lawrence - Superintendent
Vote Results:

Original Motion
Member Linda Mayo Moved, Member Lynne Dennler seconded to approve the Original motion 'Approval of the District's Positive Certification is recommended.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 4 Nay: 0 Abstain: 1.
The motion Carried 4 - 0
   
Gary Eberhart     Yes
Linda Mayo     Yes
Sherry Whitmarsh     Yes
Lynne Dennler     Yes