Review Agenda Item
Meeting Date: 9/14/2010 - 7:30 PM
Category: Consent Agenda
Type: Action
Subject: 8.21 (Item 21) Contract for Architectural Structural Engineering Services for the Design of Necessary Repairs for the Multi-Use facilities at Valle Verde, Bancroft, Hidden Valley, Mt. Diablo and Highlands Elementary Schools
LCAP (Local Control Accountability Plan) Goal:
Policy:
Enclosure
File Attachment:
MISA0011-1574 - PHd Contract MU Repairs 08-14-10 r2.pdf
Summary: Assessments conducted by a structural engineer have revealed dry rot damage to structural elements at several locations in the multi-use facilities at Valle Verde, Bancroft, Hidden Valley, Mt. Diablo and Highlands Elementary Schools. Interim measures have been recommended by the structural engineer and implemented by the District. The District now requires architectural and structural engineering services to provide designs for the permanent repair of these facilities and to obtain approval from the Department of the State Architect (DSA). Staff has negotiated a contract with PHd Architects for comprehensive architectural/engineering services for said work for a not to exceed fee of $28,000. This fixed fee is fully inclusive of all work associated with the interim repairs, DSA submittals/approvals, construction administration and closeout.
Funding: Proposition 55 Funds
Fiscal Impact $28,000.00
Recommendation: Approve srchitectural/engineering contract as presented.
Approvals:
Recommended By:
Signed By:
Pete Pedersen - Measure C
Signed By:
Greg Rolen, Esq. - General Counsel
Signed By:
Steven Lawrence - Superintendent