Review Agenda Item
Meeting Date: 10/13/2009 - 7:30 PM
Category: Consent Agenda
Type: Action
Subject: 8.38 (Item 38) Contract for Architectural/Engineering Services for the Design of Additional Classrooms at College Park and Concord High Schools
LCAP (Local Control Accountability Plan) Goal:
Policy:
Enclosure
File Attachment:
PHD Architectrual Service Agreement Portable Bldg Replacement CHSand CPHS dated 10-13-09.pdf
Summary: On August 11, 2009, the Board of Education approved the budget for the construction of four (4) conventional classrooms at Concord High School and one (1) specialized Chemistry classroom at College Park High School. The District requires architectural and engineering services related to the construction of these five (5) additional classrooms. Staff has negotiated a contract with PHd Architects for comprehensive architectural/engineering services for this project for a not to exceed fee of $101,500.00.

Because staff is interested in installing photovoltaic systems on these new classrooms, a separate design/installation contract will be brought to the Board at a subsequent date for the design and installation of these solar systems. All buildings will be designed to structurally accommodate these photovoltaic systems. The budget for this five (5) classroom project is $2,220,349.00.
Funding: Proposition 55 Funding
Fiscal Impact $101,500.00
Recommendation: Approve architectural/engineering contract as presented.
Approvals:
Recommended By:
Signed By:
Pete Pedersen - Measure C
Signed By:
Richard Nicoll - Interim Sup