Subject: 15.10 Award of Bid for Bid #1645
LCAP (Local Control Accountability Plan) Goal:
Strategic Initiative 5.3 Optimal Operations and Infrastructure
Ensure that our facilities and infrastructure support and enhance student learning and safety.
Policy:
Enclosure
File Attachment:
TABER PROPOSAL BID #1645.pdf
Summary 1645.doc
Summary: Bid No. 1645 was called to provide Sports Field Lighting at Ygnacio Valley High School. The lowest responsible, responsive bidder is Taber Construction Inc., for the amount of $836,430.00. (Base bid $805,620.00 plus Alternate 1 $30,810.00).

The scope of work includes, but is not limited to: selective demolition and construction necessary for Bid 1645, New Sports Field Lighting, including associated civil, masonry, structural, plumbing, and/or electrical work as indicated in the Drawings and Specifications. Generally, these categories of work involve new masonry sound wall, conduit and wire, installation of field lighting and other modifications as required. Plus all work related to the installation of the new sanitary sewer line and water line for a future concession stand. The project may involve the "phasing" and barricading of work areas as indicated on the Plans and enumerated in these Specification.
Funding: 2010 Measure C and Proposition 55
Fiscal Impact $836,430.00: $521,988.00 from 2010 Measure C and $314,442.00 from Proposition 55
Recommendation: Approve award of Bid #1645 as presented.
Approvals:
Recommended By:
Signed By:
Laura Warner - Administrative Secretary
Signed By:
Tim Cody - Program Manager
Signed By:
Bryan Richards - Chief Financial Officer
Signed By:
Jayne Williams - Interim General Counsel
Signed By:
John Bernard - Interim Superintendent
Vote Results: