Subject: 14.21 (Item #21) Approve Final Change Order (FCO) #1649-001 to B Bros Construction, Inc.
LCAP (Local Control Accountability Plan) Goal:
Policy:
Enclosure
File Attachment:
FCO_1649-001.pdf
Summary: On February 26, 2014, the Board of Education awarded Bid #1649 to B Bros Construction, Inc. for $349,770 for the provision of all tools, materials, labor and equipment necessary to complete site work, demolition and construction necessary renovate existing PE building at Mt. Diablo High School.

As a result of the need to 1) upgrade floor sink; 2) de-scope miscellaneous components and add restroom exhaust fan; 3) In-fill door to hallway and match adjacent surfaces; 4) abatement of discovered asbestos covered piping; and 5) additional roofing to facilitate relocation of all HVAC piping to roof, a final change order in the amount of $4,499.00 is necessary. The single, final change order will result in a final, revised contract value of $354,269.
Funding: 2010 Measure C
Fiscal Impact $4,499.00
Recommendation: Approve the Final Change Order (FCO) #1649-001 to B Bros Construction, Inc..
Approvals:
Recommended By:
Signed By:
Tim Cody - Program Manager
Signed By:
Dr. Nellie Meyer - Superintendent
Vote Results:

Original Motion
Member Moved, Member seconded to approve the Original motion 'Approve all Consent Agenda items.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0.
The motion Carried 5 - 0
   