Meeting Date:   11/5/2012 - 7:30 PM
Category:   Consent Agenda
Type:   Action
Subject:   8.9 (Item #9) Award of Bid #1618 to provide Structured Cabling, Adding Ethernet Drops in Classrooms with Fiber Optic Backbone at Secondary Schools
Strategic Plan
Policy:  
Enclosure
File Attachment:  
BID SUMMARY #1618 (2).pdf
BID PROPOSAL #1618 WALKER TELECOMM INC.pdf
Summary Bid No. 1618 was called to provide Structured Cabling, Adding Ethernet Drops in Classrooms with Fiber Optic Backbone at Secondary Schools. The lowest responsible, responsive bidder was DecoTech Systems, Inc., which rescinded their bid. The second lowest responsible, responsive bidder was Walker Telecomm, Inc., for the total amount of $1,094,141.00.

The scope of work includes, but is not limited to: provide Structured Cabling, Adding Ethernet Drops in Classrooms with Fiber Optic Backbone at College Park HS, Mt. Diablo HS, Oak Grove MS, Riverview MS, Northgate HS, Concord HS, Ygnacio Valley HS, Clayton Valley HS, Sequoia MS, El Dorado MS, Foothill MS, Loma Vista Adult Center, Diablo View MS, and Valley View MS.

Engineer's estimate $1,150,000.00
Funding Measure C 2010
Fiscal Impact $1,094,141.00
Recommendation Approve Award of Bid as presented.
Approvals:  
Recommended By:
Signed By:
Laura Warner - Administrative Secretary
Signed By:
Pete Pedersen - Measure C
Signed By:
Greg Rolen, Esq. - General Counsel
Signed By:
Bryan Richards - Chief Financial Officer
Signed By:
Steven Lawrence - Superintendent
Vote Results:  

Original Motion
Member (Linda Mayo) Moved, Member (Lynne Dennler) seconded to approve the Original motion 'Approve Consent Agenda.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0.
The motion CARRIED 5 - 0