18.19 Final Change Order for LLB #1616 – Taber Construction Inc. for Chemistry Classrooms 2013 at Concord/Nueva Vista and College Park High School.  
LCAP (Local Control Accountability Plan) Goal:
Strategic Initiative 5.3 Optimal Operations and Infrastructure
Ensure that our facilities and infrastructure support and enhance student learning and safety.
 
Policy:
 
Enclosure:
 
File Attachment:
01-FCO1616-001.pdf
 
Summary:
On March 25, 2013 the Board of Education awarded Lease / Leaseback Agreement #1616 to Taber Construction, Inc. for a Guaranteed Maximum Project Cost of $3,447,300.00 for the provision of all tools, materials, labor and equipment necessary to complete a construction of SMART Chemistry classrooms at Concord(and Nueva Vista) and College Park High Schools.

As a result of unused contract contingency, a single, final deductive change order in the amount of <$100,407.00> is necessary. This single, final change order will result in a final revised contract value of $3,346,893.00 and represents a decrease of 2.91% to original contract value.
 
Funding:
2010 Measure C  
Recommendation
Approve Final Change Order as presented.  
Approvals:
Recommended By:
Signed By:
Tim Cody - Program Manager
Signed By:  
Dr. Nellie Meyer - Superintendent
 
Vote Results:

New Motion
Member Linda Mayo Moved, Member Lynne Dennler seconded to approve the New motion 'Approve deductive Change Order for LLB #1616 – Taber Construction Inc. for Chemistry Classrooms 2013 at Concord/Nueva Vista and College Park High School. '. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0.
The motion Carried 5 - 0
   
Linda Mayo     Yes
Lynne Dennler     Yes
Cheryl Hansen     Yes
Brian Lawrence     Yes