Agenda Item
Meeting Date:
9/25/2013 - 7:30 PM  
Category:
Consent Agenda  
Type:
Action  
Subject:
8.16 (Item #17) Final Change Order for LLB Project # 1648 for painting at various school sites (Meadow Homes & Oak Grove).  
LCAP (Local Control Accountability Plan) Goal:
Strategic Initiative 5.3 Optimal Operations and Infrastructure
Ensure that our facilities and infrastructure support and enhance student learning and safety.
 
Policy:
 
Enclosure:
 
File Attachment:
Final CO Doc_1648.pdf
 
Summary:
On June 3, 2013, the Board of Education awarded Lease Lease-Back Agreements #1648 with Diamond Painting Co. KK. for a Guaranteed Maximum Project Cost of $180,000.00 for 2 Schools - Oak Grove Middle School and Meadow Homes Elementary School. As a result of a need to: 1) Place a primer coat on previously non painted integrated color surfaces on some newer buildings; 2) Painting of previously painted metal fence posts away from buildings; 3) Application of 2 paint colors at Oak Grove F, E wings and Gym; 4) Return of un-used contingency fund, staff is recommending a single, final DEDUCTIVE change order in the amount of ($1,676). This single, final change order constitutes 2.9% contract changes and will result in a final contract value of $178,324.00.  
Funding:
Proposition 55  
Fiscal Impact:
($1,676.00)  
Recommendation
Approve as Recommended  
Approvals:
Recommended By:
Signed By:
John Willford - Assistant Program Manager
Signed By:  
Tim Cody - Program Manager
Signed By:  
John Bernard - Interim Superintendent
 
Vote Results:

Original Motion
Member Moved, Member seconded to approve the Original motion 'Approve Consent Agenda.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0.
The motion Carried 5 - 0
   
Linda Mayo     Yes
Lynne Dennler     Yes
Cheryl Hansen     Yes
Barbara Oaks     Yes
Brian Lawrence     Yes