Agenda Item
Meeting Date:
2/6/2012 - 7:30 PM  
Category:
Consent Items Pulled for Discussion  
Type:
Action  
Subject:
10.1 (Item #11) Award of Design Services Contract for the Design of Gymnasium Improvements at Ygnacio Valley High School  
LCAP (Local Control Accountability Plan) Goal:
 
Policy:
 
Enclosure:
 
File Attachment:
MISA0011-1574%20-%20CHA%20Contract%20Gym%20Beautification%20YVHS%201.24.12%20r1[1].pdf
CHA-2012%20Auto%20Insurance%20Cert[1].pdf
CHA%20Insurance%20(except%20auto)[1].pdf
 
Summary:
On June 28, 2011, the Board of Education approved High School Enhancement Projects for each of the comprehensive high schools and Olympic High School. As part of this greater approval, the Board approved the installation of multiple improvements to the interior of the gymnasium at Ygnacio Valley High School. Included in those identfied improvements was the replacement of the existing ceiling system.

Staff has negotiated a 'not to exceed', fully inclusive contract with Charles Ham Architects for the provision of comprehensive engineering, architectural and administrative (DSA) services necessary to satisfactorily complete these specified improvements for a fixed fee of $20,522.00
 
Funding:
2010 Measure C Funds  
Fiscal Impact:
$20,522.00  
Recommendation
Approve award of design services contract as presented.  
Approvals:
Recommended By:
Signed By:
Pete Pedersen - Measure C
Signed By:  
Steven Lawrence - Superintendent
 
Vote Results: