|
Meeting Date:
|
|
Category:
|
|
Type:
|
|
Subject:
|
15.33 Review and Potential Approval of Proposal for Labor and Materials to install Window Coverings at Mt. Diablo High School from ABC School Equipment, Inc. |
|
|
LCAP (Local Control Accountability Plan) Goal:
|
Goal 1: All students will receive a high quality education in a safe and welcoming environment with equitable and high expectations, access to technology, and instruction in the California State Standards that prepare them for college and/or career.
|
|
|
Enclosure:
|
Mt Diablo HS Window Coverings Proposal |
|
|
File Attachment:
|
|
Summary:
|
By utilizing procedures outlined in CUPCCAA (Public Contract Code, Section 22000 et seq.), District staff requested proposals from approved vendors for labor and material to complete the Window Covering Installation that was previously identified as part of the Measure C High School Enhancement II site specific scope. ABC School Equipment Inc., provided the lowest, responsible proposal. |
|
|
Funding:
|
|
Recommendation
|
Move to approve proposal for labor and materials to install window coverings at Mt. Diablo High School from ABC School Equipment, Inc. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
 |
Melanie Koslow - Assistant Director, Maintenance, Operations & Facilities |
|
Signed By: |
|
Elizabeth McClanahan - Director of Purchasing and Warehouse |
|
Signed By: |
|
Mika Arbelbide - Director of Fiscal Services |
|
Signed By: |
|
Dr. Lisa Gonzales - Chief Business Officer |
|
Signed By: |
|
Dr. Adam Clark - Superintendent |
|
|
|
|
|
|
|